Japan Tokyo New Construction: 2020
Renovation : 2023

Tokyo Aquatics Centre
<TOKYO 2020 Phase>

Sport

Total floor area
New Construction: 64,404.68㎡
Renovation:
50,692.05㎡
Number of stories
4 levels with 1 basement level

Schematic Design: Yamashita Sekkei
Collaborator on the Schematic Design: Tange Associates
Construction Supervision: Yamashita Sekkei
Collaborator on the Construction Supervision (for new construction): Tange Associates

  • TOP
  • WORKS
  • Tokyo Aquatics Centre
    <TOKYO 2020 Phase>